• So You Think I Should Vote?
  • QNetNews.ca
  • QNetNews TV
  • 91X FM News
  • QNetNews Interactive

QNetNews.ca

  • TwitterTwitter
  • VimeoVimeo
  • FacebookFacebook

Local

When will the Bridge Street bridge be open again?

  • October 2, 2014 at 11:35 am
Bridge Street bridge

The Bridge Street bridge has been closed to traffic since last June.

By Aynslee Darmon

BELLEVILLE – The Bridge Street bridge has been closed for construction since June 17 and was scheduled to reopen in September. Now, since it’s October, QNetNews is looking into why the bridge is still under construction and closed to traffic.

We’ll be talking to city hall officials about the project and when residents can expect to be able to use the bridge again.

More to come.

No related posts.

Print This Post Print This Post

Tags: BellevilleQNet News

    Related Posts

  • Truck driver charged with distracted driving November 28, 2016
  • “Quinte Repair Cafe” happening this weekend October 24, 2014
  • Has a higher minimum wage helped Belleville residents? Opinions vary October 18, 2018
  • QNet News TV April 5 – News in 90 April 5, 2017
  • Top Stories

    • It’s -30- for journalism at Loyalist College, at least for nowApril 22, 2025
    • Gurbakhshish Singh a volleyball player at Loyalist College.Gurbakhshish Singh becomes first international student to play volleyball for Loyalist College.March 26, 2025
    • Bridge Integrated Care Hub moves forward with federal fundingMarch 24, 2025
    • OPSEU Local president talks about impact of program, job cutsMarch 21, 2025
    • Cricket player hopes to grow the game in Quinte areaMarch 21, 2025
  • Home
  • Local
  • When will the Bridge Street bridge be open again?
  • Login
    Student Works
    Students
    • TwitterTwitter
    • VimeoVimeo
    • FacebookFacebook

    © 2014 QNetNews.ca. All Rights Reserved.